Prev Question
Next Question

You are the Test Manager of a project that adopts a V-model with four formal levels of testin

G. unit,
integration, system and acceptance testing.
On this project reviews have been conducted for each development phase prior to testing, which is to say
that reviews of requirements, functional specification, high-level design, low-level design and code have
been performed prior to testing.
Assume that no requirements defects have been reported after the release of the product.
Which TWO of the following metrics do you need in order to evaluate the requirements reviews in terms of
phase containment effectiveness?

A. Number of defects found during the requirements review

B. Total number of defects attributable to requirements found during unit, integration, system and
acceptance testing

C. Total number of defects found during functional specification review, high-level design review, low-level
design review, code review, unit testing, integration testing, system testing and acceptance testing

D. Time to conduct the requirements review

E. Total number of defects attributable to requirements, found during functional specification review, high- level design review, low-level design review, code review, unit testing, integration testing, system testing
and acceptance testing

Explanation:

Prev Question
Next Question
Tagged:

Leave a Reply

Your email address will not be published. Required fields are marked *